We are a family firm of builders who adapt people’s homes so they can stay independent in them — level-access wet rooms, ramps, wider doors, ground-floor bedrooms. Almost all of it funded by councils through Disabled Facilities Grants, and almost all of it found through someone who recommended us.
* Sample figures for layout — to be confirmed by the client. 98% of work arrives by referral or repeat instruction; typical OT referral to completion around 9 weeks.
Folio I — History
The ledger, 1996 to now
Thirty years, told in the entries that changed how we work.
1996
First entry: a ramp in Wymondham
Our founder takes his first council-funded adaptation — a timber-framed ramp and a rail. Job book No. 1 opens.
1999
The first level-access shower
Before “wet room” was a common phrase. We learn tanking, falls and drainage the careful way, and still use the same standards.
2004
Working alongside occupational therapists
Regular referrals begin through home improvement agencies. We start joining OT visits to measure while the assessment is fresh.
2009
Ground-floor extensions
First bedroom-and-bathroom extension for a young man returning home from hospital. Extensions become a third of our work.
2014
Second generation joins
Tom joins full-time after training as a site manager. Health and safety paperwork moves off the kitchen table.
2020
Working safely through the pandemic
Urgent hospital-discharge adaptations continue under new site procedures written with our council partners.
2026
Thirty years, same book
Four thousand entries and counting. The first page still sits in the office, a little coffee-stained.
Folio II — Index of work
What we build
Everything an occupational therapist is likely to recommend, built by our own people, to the specification in the OT’s report.
01
Level-access wet rooms
Baths out, level floors in: tanking, falls to a floor drain, anti-slip finishes, seats, rails and thermostatic controls.
6–10 days
02
Ramps & level thresholds
Concrete, masonry or modular ramps at safe gradients, with handrails and level door thresholds.
2–5 days
03
Door widening
Openings widened for wheelchairs and walking frames, with lintels, new frames and making good.
1–3 days
04
Stairlift & through-floor lift preparation
Structural openings, trimming, power supplies and making good so the lift installer can fit on the day.
2–6 days
05
Ground-floor bedroom & bathroom extensions
Full design-and-build, from planning and Building Control to the final snag — for people who can no longer use the stairs.
8–14 weeks
06
Kitchen adaptations
Height-adjustable worktops and hobs, pull-down storage, knee space and reachable controls.
4–8 days
07
Hoist-ready structure & grab rails
Ceiling reinforcement for tracked hoists, and rails fixed into sound structure, not plasterboard.
1–4 days
08
Dropped kerbs & access paths
Firm, level routes from the pavement to the door, with dropped kerbs arranged with the highways team.
3–7 days
Durations are typical sample ranges on site, not quotes.
Folio III — The job book
Recent entries
Copied from the book as written, with names and addresses removed. Each one is a sample entry for this mock-up.
Job book, vol. XXX — sample entries, to be replaced with real (anonymised) jobs
Ref.
Home
Asked for
Days
Remarks
4,112
1930s semi, Norwich
Bath to level-access wet room, rails, fold-down seat
8
Mrs H. showering on her own again.
4,109
Bungalow, near Diss
Rear ramp at 1:15, level threshold, door widened to 900 mm
4
Garden back in use.
4,097
Terrace, Lowestoft
Ground-floor bedroom & en-suite extension
52
Home from hospital to his own room.
4,090
Housing association flat, Ipswich
Height-adjustable worktop and hob, lowered sink
5
Cooks for the family again.
Photo: finished wet room — to be supplied
Sample case · No. 4,112
Bathroom to level-access wet room
Home
1930s semi-detached
Time
8 working days
Funding
Disabled Facilities Grant
Suspended timber floor lowered between joists to get a true level entry. Heated seat position agreed with the OT on day one.
The people who refer us, and the people whose homes we work in.
They read the whole report, not just the drawing. When the bathroom turned out smaller than the plans, they rang me before changing anything. That’s why I recommend them.
Senior Occupational TherapistCounty council adult social careSample testimonial — to be replaced
Their paperwork arrives complete and their prices are the prices. Over many years I can’t think of a grant file of theirs I had to chase.
Grants OfficerDistrict council private sector housingSample testimonial — to be replaced
Mum was anxious about builders in the house. They explained each day before they started, cleaned up every evening, and asked her how she wanted the rail. She still talks about them.
Daughter of a clientNear Beccles, SuffolkSample testimonial — to be replaced
Folio V — Seals & registers
Accreditations
The schemes and registers we belong to. Each slot below will hold the official mark once supplied.
iCHASLogo — to be supplied
iiConstructionline GoldLogo — to be supplied
iiiSafeContractorLogo — to be supplied
ivTrustMarkLogo — to be supplied
vISO 9001Certificate — to be supplied
viISO 45001Certificate — to be supplied
viiWhich? Trusted TraderLogo — to be supplied
viiiFederation of Master BuildersLogo — to be supplied
Accreditation marks are placeholders; memberships to be confirmed by the client.
Folio VI — The filing drawer
Procurement document pack
For grants officers and framework managers: everything usually asked for at supplier approval, kept current and ready to download.
The same order of work we’ve followed for three decades, whether the referral comes from an OT, a grants officer or a home improvement agency.
Referral received
From the OT, council or agency. We acknowledge the same working day.
Joint survey
We visit with the OT where possible, measure, and talk to the person who lives there.
Schedule & price
An itemised schedule of works to the OT’s specification, for the grant approval.
On site
A named site lead, a start and finish date, and a daily word with the household.
Handover
Walk-through with the client and OT, certificates to the council, a follow-up call at six weeks.
Colophon & correspondence
Write to us, or ring
OTs and grants officers: send a referral by email and we’ll acknowledge it the same working day. Families: ring and ask for Tom — we’re happy to explain how the grant process works before anything is decided.