Level-access wet rooms
Bath and shower conversions with gradient floors, anti-slip finishes and space to turn.
Typical: 6–10 working daysFor occupational therapists
We have turned OT recommendations into working homes across Norfolk and Suffolk since 1996. You get a named contact, a site visit within days, and drawings you can check against your assessment before anyone lifts a tool.
Thirty years of referrals
Almost all of our work comes from therapists, grants teams and housing providers who have used us before. That's the record we want you to judge us on.
Sample figures — illustrative placeholders, to be confirmed by the firm.
What we build
Grant-funded or privately paid, the standard is the same.
Bath and shower conversions with gradient floors, anti-slip finishes and space to turn.
Typical: 6–10 working daysGradients planned to the user and the site, with handrails, landings and drainage.
Typical: 2–5 working daysOpenings widened for wheelchairs and walking frames, with lintels, frames and making good.
Typical: 1–3 days per openingStructural openings, trimming, power and making good, co-ordinated with the lift installer.
Typical: 3–8 working daysBedroom and bathroom extensions so someone can live on one level, from planning to handover.
Typical: 10–16 weeks on siteHeight-adjustable worktops and hobs, pull-down storage and knee space where it's needed.
Typical: 5–10 working daysRails fixed into solid backing, and ceilings strengthened for track hoists with load notes.
Typical: same week for minor worksFirm, level routes from the road to the door, with highways applications handled for you.
Typical: 3–6 working daysReferral pathway
Five stages, one named contact. At each stage you know what happens next and when.
We acknowledge it the same working day and give you the name of your contact.
Day 0–1We phone the client first, then measure and photograph. You're welcome to join.
Within 5 working daysA marked-up plan and priced schedule for you to check against your recommendation.
Within 10 working daysOnce the grant is approved we agree a start date with the client, never imposed.
Set by the grant timelinePhotos, final measurements and certificates sent to you and the grants team.
Handover pack in 2 daysPlanning ahead
Updated each month so you can give clients an honest answer. Urgent cases (hospital discharge, end of life) are prioritised; tell us on the referral.
| Adaptation | Referral to survey | Approval to start | Time on site |
|---|---|---|---|
| Level-access wet room | 3–5 days | 3–4 weeks | 6–10 days |
| Ramp or level threshold | 3–5 days | 2–3 weeks | 2–5 days |
| Door widening | 3–5 days | 2–3 weeks | 1–3 days each |
| Stairlift or through-floor lift prep | 5 days | Matched to lift supplier | 3–8 days |
| Kitchen adaptation | 5 days | 4–5 weeks | 5–10 days |
| Ground-floor extension | 5–7 days | Planning dependent | 10–16 weeks |
| Minor works (rails, steps, lighting) | 1–3 days | Same or next week | Half a day |
Bars show relative time on site. Lead times are indicative and depend on grant approval and materials.
Make a referral
Tick through the checklist while you fill in the form. If something isn't ready yet, send what you have and we'll start with the survey.
0 of 6 ready
Spec and standards
We're builders, not therapists, so your recommendation leads. These are the standards we check it against, and where we'll ring you if something on site doesn't fit.
Door widths, threshold heights, turning space and WC layouts checked against current access guidance before we price.
Building Regulations, Part M1500mm turning space marked on every wet-room and bedroom drawing where the room allows it, and flagged where it doesn't.
Shown on survey drawingsShower floor gradients set so water drains without creating a slope that's hard to manoeuvre on.
Wet-room floor build-up notesEvery grab rail fixed into timber noggins or masonry, heights confirmed with you or marked on site with the client.
Fixing schedule in handover packCeiling strengthening for track hoists with a load note from the structural engineer, so the hoist supplier can fit with confidence.
Engineer's note suppliedContrasting rails, sanitaryware and floor edges for people with low vision, where your assessment asks for it.
Finish scheduleGuidance references are indicative; the firm's own compliance wording is to be supplied.
Recent work
Tight 1.9m room: we moved the door to create a 1500mm turning space and kept the client's bath until day three so she could wash.
Read the case studyReferral on Monday, surveyed Tuesday, finished the Friday before discharge, with a temporary ramp in place on day one.
Read the case studyA hoist-ready bedroom for a teenager, planned around school holidays and built with the family living at home.
Read the case studyIn their words
Sample testimonials, to be replaced with real ones
"They ring me before they change anything, not after. When a room can't take the full turning circle, I hear about it at survey stage with options, not on handover day."
"Their schedules of work are clear enough to approve without a round of queries, and the documents are always in date. That saves weeks on a grant."
"Mum was worried about builders in the house. They explained each day what was happening, kept the hall clear for her frame, and she could shower on her own again by the second week."
Procurement document pack
Document links are placeholders; files to be supplied by the firm.
Accreditations
Accreditation logos to be supplied. Slots shown for layout only.
When we're in your home
Get in touch
Referrals, grant queries or a worried phone call about what happens next: all welcome. Office open Monday to Friday, 8am to 5pm.